It looks great, you must have spent a lot of time preparing it.
Hi, sorry for the late reply.
The work began in the autumn of 2009.
There were many problems to solve.
One year later, in the autumn of 2010, the model train layout was almost ready.
Here are the stages of work:
1. making the base of wood.
2. laying the track.
3. laying cables and connecting the entire system.
4. making platforms.
5. installation of the buildings, sold separate, only need to be assembled.
6. laying the grass, sell on sheets and stick to the base.
7. ballasting the rails with a special small ballast and sticking it.
8. making roads.
9. landscaping with trees and pine trees, sold separate.
10. making hills and mountains.
Here is a short video of 3 minutes, which shows my job for 1 year.